| 14.0 | THE RIVER MAY BEGIN TO AFFECT STRUCTURES IN THE TECUMSEH WASTE WATER TREATMENT PLANT. | | 13.0 | ***FLOOD STAGE*** THE RIVER BEGINS TO FLOOD RAISIN CENTER HIGHWAY BY THE GAGE. | | 7.0 | BANKFULL IS REACHED. OVERFLOW INTO WOODS AND SOME FIELDS BEGIN. |
|
1) 12.66 ft on 06/26/1968
2) 12.07 ft on 03/14/1982
3) 12.00 ft on 02/24/1985
4) 11.80 ft on 12/31/1990
5) 11.50 ft on 01/05/1993
|
Low water records are unavailable.
|
|