| 27.0 | Flooding of the entire area in the vicinity of the gage occurs. Water overflows the bridge. | | 24.0 | Major flooding begins. | | 20.0 | Flow reaches the bottom of the bridge. Mining and some industrial areas are affected. | | 18.0 | Flood Stage is reached. | | 16.0 | Minor overflow occurs towards the industrial area along the north bank. |
|
1) 14.30 ft on 02/12/2005
2) 6.77 ft on 02/15/2003
3) 5.82 ft on 03/05/2004
4) 3.12 ft on 08/12/2006
|
1) 1.20 ft on 01/01/2004
|
|