| 25.0 | MOST OF FLOMATON WILL BECOME FLOODED AS THE LEVEL RISES ABOVE 25 FEET. | | 17.5 | RESIDENTIAL FLOODING WILL OCCUR IN FLOMATON AND SOME EVACUATIONS WILL LIKELY BE NEEDED. | | 16.5 | FLOODING OF HIGHWAY 31 NEAR THE FLOMATON HIGH SCHOOL WILL SUBSIDE AS THE LEVEL DROPS BELOW 16 FEET. | | 16.0 | FLOODING OF HIGHWAY 31 NEAR THE FLOMATON HIGH SCHOOL WILL BEGIN AS THE LEVEL RISES ABOVE 16 FEET. | | 14.5 | FLOODING OF LOWLANDS IN THE AREA WILL GRADUALLY SUBSIDE AS THE CREEK DROPS BELOW 14 FEET AND CONTINUES TO FALL. | | 14.0 | SOME HOMES NORTH OF HIGHWAY 31 MAY BECOME AFFECTED BY FLOOD WATER AS THE LEVEL RISES ABOVE 14 FEET. | | 11.0 | MINOR OVERFLOW OF LOW LYING AREAS WILL OCCUR AND WATER MAY ENTER THE YARDS OF A FEW HOMES IN THE AREA. |
|
1) 25.90 ft on 03/31/1929
2) 20.40 ft on 09/30/1998
3) 19.70 ft on 03/09/1998
4) 19.40 ft on 04/14/1955
5) 19.26 ft on 09/27/1939
|
1) 0.41 ft on 10/19/1952
2) 0.42 ft on 08/30/1951
3) 0.52 ft on 07/02/1950
|
|