My Forecast | Weather Directory | Biosphere Blog | HWmobile Local Weather:  
Rio Grandeat Eagle Pass, TX (Gauge EPPT2)
Observation History | Stage Impacts/Record Events
Stages:
Normal
Action
Flood
Moderate Flood
Major Flood
River Stage Data for Gauge EPPT2
Normal Stage: 5.1 ft
Flow: 5.56 kcfs*
(impacts and historical events)
Action Stages:
9': Action
16': Flood
18': Moderate Flood
25': Major Flood
Gauge EPPT2 History chart | graph
Stage Date CST Stage ft Flow kcfs
CURRENT 02/16/2012 07:15 am 5.10 5.560
  02/16/2012 07:00 am 5.07 5.500
  02/16/2012 06:45 am 5.03 5.420
  02/16/2012 06:30 am 4.98 5.320
  02/16/2012 06:15 am 4.89 5.140
  02/16/2012 06:00 am 4.85 5.060
  02/16/2012 05:45 am 4.84 5.040
  02/16/2012 05:30 am 4.81 4.980
  02/16/2012 05:15 am 4.80 4.960
  02/16/2012 05:00 am 4.77 4.900
  02/16/2012 04:45 am 4.76 4.880
  02/16/2012 04:30 am 4.75 4.860
  02/16/2012 04:15 am 4.75 4.860
  02/16/2012 04:00 am 4.74 4.840
  02/16/2012 03:45 am 4.74 4.840
  02/16/2012 03:30 am 4.74 4.840
  02/16/2012 03:15 am 4.74 4.840
  02/16/2012 03:00 am 4.75 4.860
  02/16/2012 02:45 am 4.76 4.880
  02/16/2012 02:30 am 4.77 4.900
  02/16/2012 02:15 am 4.79 4.940
  02/16/2012 02:00 am 4.80 4.960
  02/16/2012 01:45 am 4.82 5.000
  02/16/2012 01:30 am 4.85 5.060
  02/16/2012 01:15 am 4.86 5.080
  02/16/2012 01:00 am 4.89 5.140
  02/16/2012 12:45 am 4.90 5.160
  02/16/2012 12:30 am 4.91 5.180
  02/16/2012 12:15 am 4.92 5.200
  02/16/2012 12:00 am 4.93 5.220
  02/15/2012 11:45 pm 4.94 5.240
Flood Impacts and Historical Events
Stage Impacts
54.0(16.5 METERS)...WATER IS TO THE HEADS OF PARKING METERS IN THE DOWNTOWN SECTION OF EAGLE PASS WITH MAJOR DAMAGE TO THE INTERNATIONAL HIGHWAY AND RAILROAD BRIDGES. WATER IS SEVERAL INCHES DEEP AT THE INTERSECTION OF MONROE AND MAIN STREETS. MOST OF EAGLE PASS AND PIEDRAS NEGRAS ARE EVACUATED AT THIS LEVEL WITH MANY HOMES SEVERELY FLOODED BELOW AMISTAD DAM TO BELOW LAREDO. THOUSANDS OF CATTLE ARE CUT OFF AND DROWNED BELOW DEL RIO TO FALCON LAKE
51.0(15.5 METERS)...FLOW INUNDATES THE MAIN BUSINESS SECTION OF EAGLE PASS CAUSING MOST OF EAGLE PASS AND PIEDRAS NEGRAS TO BE EVACUATED. THE INTERNATIONAL HIGHWAY BRIDGE AND RAILWAY BRIDGE FLOORS ARE SEVERELY FLOODED. RESIDENCES IN THE FLOOD PLAIN BELOW AMISTAD DAM TO BELOW LAREDO ARE SEVERELY FLOODED WITH LIFE THREATENING CONDITIONS. THOUSANDS OF CATTLE ARE CUT OFF AND DROWNED
47.0(14.3 METERS)...MAJOR FLOODING INUNDATES MUCH OF THE RESIDENTIAL AND BUSINESS AREAS OF EAGLE PASS AND PIEDRAS NEGRAS. THREATENING THE DOWNTOWN SECTION OF EAGLE PASS. THE INTERNATIONAL BRIDGE IS SEVERELY FLOODED AND DAMAGED. NEARLY ALL HIGHWAYS INTO EAGLE PASS ARE CLOSED
46.0(14.0 METERS)...WIDESPREAD DISASTROUS FLOODING REACHES MUCH OF THE RESIDENTIAL AND BUSINESS AREAS OF EAGLE PASS AND PIEDRAS NEGRAS. THE INTERNATIONAL BRIDGE IS UNDER SEVERAL FEET OF WATER. MOST ROADS INTO EAGLE PASS ARE SEVERELY FLOODED
42.5(12.6 METERS)...FLOW REACHES THE ELEVATION OF THE PIEDRAS NEGRAS LEVEE. MUCH OF THE RESIDENTIAL AREA IS PROTECTED TO THIS LEVEL BUT NOT NEARLY ALL. BUSINESS AND RESIDENTIAL FLOODING IN PIEDRAS NEGRAS AND LAREDO IS DISASTROUS. THE INTERNATIONAL BRIDGE FLOOR IS THREATENED. CATTLE BELOW DEL RIO TO FALCON DAM ARE TRAPPED AND POTENTIALLY DROWNED. ROADS AND BRIDGES WELL AWAY FROM THE RIVER ARE FLOODED AND DANGEROUS
39.0(11.9 METERS)...WIDESPREAD MAJOR FLOODING REACHES THE FIRST CITY BLOCKS OF DOWNTOWN EAGLE PASS FLOODING MANY HOMES AND BUSINESSES. MOST ROADS INTO EAGLE PASS ARE CLOSED INCLUDING HIGHWAY 277
35.0(10.7 METERS)...MAJOR FLOODING. SHELBY PARK IS UNDER WATER. THE GOLF COUSE IS UNDER WATER. SEVERAL FEET OF WATER COVERS THE INTERSECTION OF RYAN AND MAIN STREETS. WATER BEGINS TO IMPACT 20 HOMES AND BUSINESSES IN THE FIRST BLOCKS ADJACENT TO THE RIVER. WATER APPROACHES THE LOWEST HOMES ON RIO DRIVE IN THE LAS BRISAS SUBDIVISION. FLOW BACKS UP SECO CREEK OVER A MILE FLOODING HOMES. ELM AND EAGLE PASS CREEKS FLOOD STREETS AND ROADS
31.0(9.5 METERS)...MAJOR FLOODING. WATER REACHES THE PARKING LOT OF THE LUCKY EAGLE CASINO. WATER REACHES LOWEST RESIDENCES IN THE FLOOD PLAIN FLOOD BELOW AMISTAD DAM TO BELOW LAREDO. STREETS...ROADS AND BRIDGES NEAR THE RIVER ARE DANGEROUSLY FLOODED. LIVESTOCK ARE TRAPPED AND POSSIBLY DROWNED BELOW DEL RIO TO BELOW LAREDO
29.0(8.8 METERS)...CONDITIONS ARE LIFE THREATENING WITH WATER REACHING INTO THE LOWEST HOMES AND BUSINESSES. CATTLE ARE TRAPPED AND POTENTIALLY DROWNED IN THE FLOOD PLAIN BELOW DEL RIO TO BELOW LAREDO.
25.0(7.6 METERS)...MAJOR FLOODING THREATENS THE LOWEST HOMES AND BUSINESSES IN EAGLE PASS. LIVESTOCK ARE TRAPPED AND POTENTIALLY DROWNED IN THE FLOOD PLAIN BELOW DEL RIO TO ABOVE LAREDO. ROADS AND LOW BRIDGES NEAR THE RIVER FLOOD AND ARE DANGEROUS
21.0(6.4 METERS)...WATER REACHES RYAN STREET ABOVE SHELBY PARK. RIVER FLOW IS TO THE EDGE OF THE BLUFF ON THE LEFT BANK AT EAGLE PASS. LIVESTOCK IN THE FLOOD PLAIN CAN BE TRAPPED AND DROWNED. ANY EQUIPMENT IN THE FLOOD PLAIN WILL BE FLOODED OR DAMAGED
18.0(5.5 METERS)...MODERATE FLOODING. MUCH OF SHELBY PARK IS FLOODED. WATER FLOODS THE LOWEST SECTIONS OF THE GOLF COURSE. LOWLAND FLOODING IS WELL INTO THE FLOOD PLAIN AT EAGLE PASS. FLOODING ANY ACTIVITIES OR EQUIPMENT IN THE FLOOD PLAIN
16.0(4.9 METERS)...WATER COVERS A SMALL PORTION OF SHELBY PARK AND THE GOLF COURSE. MINOR LOWLAND FLOODING CAN CUT OFF AND DROWN LIVESTOCK IN THE RIVER CHANNEL. IRRIGATION PUMPS AND EQUIPMENT ARE DAMAGED IN THE FLOOD PLAIN. ANY ACTIVITY OR FESTIVITIES IN THE FLOOD PLAIN AT EAGLE PASS ARE FLOODED
13.0(4.0 METERS)...OVERBANK CONDITIONS WITH WATER WELL INTO THE FLOOD PLAIN THREATENING LIVESTOCK AND IRRIGATION PUMPS
Historical Crests Record Lows
1) 55.99 ft on 06/01/1965
2) 53.51 ft on 06/29/1954
3) 47.80 ft on 09/02/1932
4) 46.90 ft on 06/25/1948
5) 43.70 ft on 06/19/1922
Low water records are unavailable.

Data provided by NOAA Advanced Hydrologic Prediction Service

Created with HAMweather 4 Alpha 3
© 2012 HAMweather, LLC, all rights reserved.
0.25MB : 1.176 seconds