| 45.0 | Approximate level at which Cooper Nuclear Station will shut down the plant. | | 43.0 | Most of the federal levees in the area will overtop. | | 39.5 | State Highway 136 on the Missouri side and the access road to the power plant begin flooding. | | 38.0 | Approximate level at which Cooper Nuclear Power Plant begins flooding preparations. | | 32.0 | Lowlands on both banks begin to flood. |
|
1) 44.30 ft on 07/24/1993
2) 42.89 ft on 06/23/2010
3) 41.20 ft on 06/15/1984
4) 40.70 ft on 04/17/1952
5) 40.15 ft on 06/14/2008
|
1) 15.70 ft on 02/06/1989
2) 17.20 ft on 01/11/1989
|
|