| 40.0 | Water begins to overtop the levee. | | 27.0 | Water completely flows over Highway 166 east of the levee to the Walnut River Bridge...prompting road closure. | | 26.0 | Water begins to flow across the west bound lane of Highway 166 east of the levee. | | 24.0 | The last C Street Canal gate is closed at Highway 77 at Walnut River Levee. | | 23.0 | Two C street Canal gates are closed at the Highway 77 at Walnut River Levee. | | 20.0 | Considerable flooding of farmland is expected. Widespread flooding of the park just upstream of the gage site is anticipated. East Chestnut Avenue east of By-pass is closed due to water cover roadway. Greens Farm Road floods between Highway 166 north to Dunbar Hill. | | 18.0 | Considerable flooding of farmland can be expected. There is considerable flooding upstream along the west bank of the Walnut River. On the east bank...the ground slopes upward so that only about a 300 foot wide strip of land would be affected. | | 14.0 | The city starts closing storm water flood gates which includes the Mill Canal gates and pumps. |
|
1) 32.45 ft on 11/03/1998
2) 29.22 ft on 06/11/1995
3) 28.43 ft on 06/10/1923
4) 28.21 ft on 04/24/1944
5) 26.60 ft on 11/18/1964
|
1) 2.55 ft on 09/12/1970
2) 2.67 ft on 01/01/1976
3) 2.90 ft on 07/23/1968
|
|