| 116.0 | First Avenue elevation...816.24 feet. | | 114.6 | Top of levee elevation at gage...814.84 feet. | | 114.0 | Highway 1 elevation...814.24 feet. | | 113.0 | Highway 220 under water. Need to sandbag South Road...813.24 feet. | | 112.5 | East Railroad elevation...812.74 feet. | | 112.0 | West Railrosd elevation...812.24 feet. | | 111.0 | Flooding in unprotected areas of Alvarado; 811.24 ft msl. | | 110.0 | Major Flood Stage...810.24 feet... flooding between Hwy 1 and rainroad grade due to backwater.
Dike walk inspections begins. | | 108.0 | Moderate Flood Stage and overland sheet flooding of local agricultural land...808.24 feet. | | 106.0 | Flood Warning Stage...minor. 806.24 feet.
Shut storm sewer flood gates. | | 105.0 | Forecast Service stage. | | 104.0 | Gatewell B elevation...804.24 feet. | | 103.0 | Gatewell A elevation...803.24 feet. | | 93.4 | Channel bottom...793.6 feet. |
|
1) 111.40 ft on 04/02/2006
2) 110.88 ft on 04/20/1997
3) 110.84 ft on 04/20/1979
4) 110.34 ft on 03/01/1966
5) 110.04 ft on 05/01/1950
6) 109.94 ft on 03/01/1969
7) 109.84 ft on 03/01/1965
8) 109.74 ft on 04/10/2001
9) 109.64 ft on 08/26/1999
10) 109.33 ft on 04/24/1956
|
1) 93.60 ft on 10/30/1979
|
|