| 26.0 | The total channel width at the gage site, north of Albert, stretches to near 4000 feet. | | 25.0 | Looking downstream, from 130 Avenue bridge, the road running parallel to Walnut Creek on the left bank begins to overflow. | | 24.0 | Looking downstream, from 130 Avenue Bridge, the road that runs adjacent to Walnut Creek on the right bank begins to overflow. | | 22.5 | Flooding of some agricultural lowlands begins. |
|
1) 25.75 ft on 09/22/1959
2) 25.20 ft on 07/25/1993
3) 24.94 ft on 03/23/1960
4) 24.76 ft on 08/14/1961
5) 24.57 ft on 09/14/1961
|
1) 0.50 ft on 10/12/1995
2) 2.80 ft on 08/01/2000
|
|